Home » Urban & Regional Planning » INVESTIGATION OF THE TOPOGRAPHY OF UNIVERSITY OF UYO PERMANENT SITE AS CASE STUD...
INVESTIGATION OF THE TOPOGRAPHY OF UNIVERSITY OF UYO PERMANENT SITE AS CASE STUDY
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 65 pages | 1-5 chapters | Amount: ₦5,000 | Marked useful: 5,852 times
INSTANT PROJECT MATERIAL DOWNLOADINVESTIGATION OF THE TOPOGRAPHY OF UNIVERSITY OF UYO PERMANENT SITE AS CASE STUDY
CHAPTER ONE
1.0 INTRODUCTION
Topography can be defined as the shape or configuration or relief or roughness or three-dimensional quality of the earth surface the object of topographical surveying is to produce a map showing elevations, natural and artificial feature and forms of the earth’s surface. It is drawn from field survey data or aerial photography’s.
Topography is a field of geosciences and planetary science comprising the study of surface shape and features of the earth and other observable astronomical objects including planets, moons and asteroids, it is also the description of such surface shapes and features (especially their depiction in maps).the topography of an area could also mean the surface shape and features themselves In general, topography is concerned with local details in general, including not only relief but also natural and artificial features and even local history and culture. The term topography originated in ancient Greece and continued in ancient Rome, as the detailed description of a place the word comes from the Greek words to one (Topos “place”) in the 20th century the term topography started to be used to describe surface description in other fields where mapping in a broader sense is used, particularly in medical fields such as neurology.
The objective of topography is to determine the position of any features or more generally any point in terms of both a horizontal coordinates system such as latitude, longitude, and altitude. Identifying (naming) features, and recognizing typical landforms patterns are also part of the field. A topography study may be made for variety of reasons military planning and geological exploration have been primary motivators to start survey programs, but detailed information about terrain and surface features is essential for the planning and construction of any major civil engineering, public works, or reclamation projects.
Though aerial or photogrammetric methods are extensively used in preparing topographic, maps, grand methods and still required for checking aerial photogrammetric and also for plotting details. For any engineering project topographic survey is a must. Whether it is laying a railroad or high way or design of irrigation or drainage systems, the topographical features of the place must be known so that correct engineering decisions may be taken.
Instruments required include transit plane table and alidade, level, hand level, tape, leveling staff and level in various combination. Total station EDM’s are used to advantage in topographic surveying.
Topographical surveys, most of the measurements are done with high quality GPs unit or with a electronic EDM instruments that measure distance with the usage of light and radio wares. The result of survey are presented in the form of comber lines on maps of the land, antlike in other types of surveys there the result are marked using stakes or other landmarks.
1.1 AIMS OF THE PROJECT
The aim of the project is to carry out a topographical survey of the project area and the production of a topographical plan showing natural and artificial features and elevation of the area which will glide or serve as a valuable instrument for planning any engineering project on the project area.
1.2 OBJECTIVES OF THE PROJECT
- To produce a topographic map of the project area.
- To produce a spot height map of the project area.
- To produce a contour map of the project area.
1.3 SCOPE OF THE PROJECT
The scope of the project includes:
- Reconnaissance survey.
- Station establishment documentation.
- Perimeter traversing.
- Traverse connection to established controls.
- Spot heighting
- Intersection most outside the university Campos.
- Detailing of features within around projectors a using tachometry and chain survey.
- Displacement of boundary pillars and re-establishment.
- Perimeter leveling.
- Filed sheet reduction.
- Computation of bearing, coordinate and elevations of points and pillars.
- Plotting of topographic map, spot height map and contour map of the project area.
1.4 AREA OF STUDY
The project was carried out of permanent site university of Uyo, Akwa Ibom state, Nigeria.
This material content is developed to serve as a GUIDE for students to conduct academic research
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
ASSESSING THE CLIMATE CHANGE ADAPTATION STRATEGIES AMIDST HEAVY FLOODING IN LAGOS STATE
CHAPTER ONE INTRODUCTION Background of the Study It is no doubt that every human activity has a direct or indirect impact on the environment, and the ...More »
Item Type: Project Material | 54 pages | 1,321 engagements |
- 2.
FLOODING IN LAGOS STATE IN 2024: EVALUATING ITS EFFECT ON THE RESIDENTIAL INFRASTRUCTURES IN APAPA
CHAPTER ONE INTRODUCTION Background of the Study The rapid process of urbanization and the expansion of large cities, particularly in developing na...More »
Item Type: Project Material | 54 pages | 1,109 engagements |
- 3.
EVALUATION OF THE EFFECT OF FLOOD ON THE SOCIO-ECONOMIC LIVELIHOOD OF URBAN COMMUNITIES
EVALUATION OF THE EFFECT OF FLOOD ON THE SOCIO ECONOMIC LIVELIHOOD OF URBAN COMMUNITIES CHAPTER ONE INTRODUCTION Background of the Study Floods, li...More »
Item Type: Project Material | 54 pages | 2,616 engagements |
- 4.
THE IMPACT OF ILLEGAL STRUCTURES ON THE CONSTRUCTION INDUSTRY
CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY According to Awoyera, Alfa, Odetoyan and Akinwumi (2020), structures are buildings that come in a...More »
Item Type: Project Material | 50 pages | 3,958 engagements |
- 5.
EXAMINING THE CORRELATION BETWEEN WASTE MANAGEMENT AND PROFITABILITY
IN MANUFACTURING FIRMS CHAPTER ONE INTRODUCTION 1.1 Background to the Study The production and management of waste is a strategic issue for all ...More »
Item Type: Project Material | 51 pages | 7,874 engagements |
- 6.
WASTE MANAGEMENT AS A TOOL FOR REVENUE GENERATION (A CASE STUDY OF RIWAMA RIVERS STATE)
CHAPTER ONE INTRODUCTION 1.1Background of the study Over the years, Nigeria has experienced rapid population growth, urbanization and industrializatio...More »
Item Type: Project Material | 65 pages | 8,689 engagements |